Kingsley Napley

Kingsley Napley

Project Overview

The very unique joinery fit out of this new headquarters is evident from the images. A 4.8m high feature column spiralled around the existing concrete column. Each fin of the feature is twisting like a propeller intersecting with the head and base at perfect right angles with uplights and downlighting between each fin. The reception desk is a mixture of chromed slats, stained veneers, Rimex metals and leather. The top floor meeting suites had limed oak fire rated veneered panelling with solid scalloped oak edging profiles. The zig zag back lit features to the corridors provided an interesting focal point. We also constructed fabric wrapped and veneered dropped ceiling features to the meeting suites, numerous reception desks, reception and lift lobby panelling, meeting room suite wall panelling cleverly concealing ugly riser doors, multiple toilet fit out, kitchens, copy points, tea points, storage, library displays and doorsets.

Project Kingsley Napley

Contractor Overbury

Architect KKS

Value £1.82M

Duration 18 weeks

Selected Views

Every Project, Every Time

Safe, Sustainable
& Compliant Delivery

Our accreditations aren’t a tick-box exercise they underpin every project we deliver, from initial design through to final installation on site.

ISO 9001
ISO 9001
ISO 9001

Safe

ISO 45001 & SSIP certified. Safety is non-negotiable on every project.

Sustainable

FSC certified timber. ISO 14001 environmental management across all operations.

Compliant

ISO 9001, BM Trada fire door certification, and FORS Silver fleet accreditation.